01.07.02 Timetable
01.07.02 Timetable
How to design a research project in communication > Working plan, periodization and schedule > Timetable
26.10.2021
Once the research project has been drawn up, it should also have a timetable detailing the tasks assigned and the period in which they will be carried out, in the form of a Gantt chart. This is called a research report, and it is the first document to be produced. It includes the definition of the topic and the concepts associated with it, the formulation of the research problem, the goals, the research questions, the variables, the relationship between them and the formulation of hypotheses, the methodology to be applied and the bibliography to be used initially.
A Gantt diagram